Case study

Home / Case study

VIZHINJAM PORT Connectivity: Preparation of Detailed project report (DPR) including survey, alignment design, GAD and estimate for the Rail connectivity from NEMOM station to the new PORT at Vizhinjam, Kerala

Services provided:

  • Surveying the topography for the connectivity including collecting the Revenue details and preparation of index plan, index section and Litho map
  • Track design, Preliminary design of 7 bridges, 2 tunnels and 3 yards and remodeling of Nemom and Balaramapuram Railway stations
  • Preparation of Detailed Project Report (DPR) for the project including cost estimation and drawings.