Case study

Home / Case study

Preparation of GAD, Design and structural drawings for the proposed Bridges for IPRVCL works

Preparation of GAD, Design and structural drawings for the proposed Bridges for IPRVCL works at VOC port, Tuticorin, Tamil Nadu and PROOF checked by IIT, Chennai.

Services provided:

  • Review the site details and prepare a General Arrangement Drawing (GAD) and get approved by Tuticorin Port and Southern Railway
  • Prepare the Design and make detailed construction drawings & assist in proof checking at IIT Chennai
  • Prepare the Bill of Quantities and special conditions of contract
  • Assist in the Tender preparation and Pre bid meeting