Case study

Home / Case study

Consultancy services for the proposed connectivity to Vizhinjam; preparation of DPR with Tunnel from Balaramapuram to Vizhinjam and Yard at Balaramapuram.

Services provided:

  • Prepare the Railway aligment from new Port at Vizhinjam to Balaramapuram (15 kms)
  • Plan the Railway siding inside the new port at Vizhinjam
  • Plan the R& D lines and yard modifications required at Balaramapuram and connect the same to the existing Railway network
  • Plan the PORT and related facilities
  • Make the costing of the project and prepare the DPR